April-May 2015



End of: Week 7

The waste pipe now in place:

Week 7



End of: Week 6

Drilling one of the piles

Three piles have been inserted - 7 to 8 metres in depth. They will be left for
seven days before the ground beams are added.

A small pipe discovered below the door may be the drain from the font!

Week 6 2Week 6 1


End of: Week 5

Week 5 1Week 5 2


End of: Week 4

Week 4 1

Week 4 2

Week 4 3


End of: Week 3


Week 3 3Week 3 2



End of: Week 2

End of week 2

It may not look as if much has happened since last week, but the sewage pipework running through the back of the Church and down the path to the Vicarage has been installed.

During installation:   

Digger                    Sewage pipe being installed

And a day later:

 Trench filled in



End of: Week 1

Week One